
Delay Analysis in Construction Contracts
841 kr.
841 kr.
Tidligere laveste pris:
851 kr.
Man., 14 juli - fre., 18 juli
Sikker betaling
14 dages åbent køb
Sælges og leveres af
AdlibrisProduktbeskrivelse
The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.
This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. The techniques discussed can be used on projects of any size, under all forms of construction contract, both domestic and international.
The authors discuss not only delay analysis techniques, but also their appropriateness under given circumstances, demonstrating how combined approaches may be applied where necessary. They also consider problematic issues including ‘who owns the float’, concurrent delay, early completion programmes, and disruption. The book has been brought fully up to date, including references to the latest publications from the CIOB, AACEI and SCL, as well as current case law. Broad in scope, the book discusses the different delay analysis approaches likely to be encountered on national and international projects, and features practical worked examples and case studies demonstrating the techniques commonly used by experienced practitioners.
This is an invaluable resource to programmers and schedulers, delay analysts, contractors, architects, engineers and surveyors. It will also be of interest to clients’ professional advisors managing extension of time or delay claims, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based.
Reviews of First Edition
"John Keane and Anthony Caletka are pukka analysts in that tricky area of delays, programming and extension of time. I highly recommend their book Delay Analysis in Construction Contracts. Buy the book." (Building Magazine, February 2009)
"The book's stated purpose is to provide a practical guide for those interested in schedule delay analysis. It provides a good in–depth review of the most common delay analysis techniques.... An excellent book, full of practical tips for the reader and very timely in its publication. It is well worth the cost and a good read for anyone involved in schedule delay analysis." (Cost Engineering, February 2009)
It achieves in spades its stated aim of being a practical guide for contractors, contract administrators, programmers and delay analysts, as well as construction lawyers who require a better understanding of the underlying assumptions on which many quantitative delay analyses are based. (Construction Law Journal, 2009)
Varenr.
f9021eee-b27f-510b-980f-467af87e6109
Delay Analysis in Construction Contracts
841 kr.
841 kr.
Tidligere laveste pris:
851 kr.
Man., 14 juli - fre., 18 juli
Sikker betaling
14 dages åbent køb
Sælges og leveres af
AdlibrisLignende topsælgere

Bright Beauty Vanity Namira - make up spejl med belysning - hollywood spejl - schminke spejl med lys - hvid - dæmpbar med tre lystilstande
539 kr.

3-pak barberblade, der er kompatible med Philips Oneblade Replacement
106 kr.

OBOSOE trådløs CarPlay-adapter, til CarPlay og Android Auto, Plug-and-play med ultralav latenstid
190 kr.
Tidligere laveste pris:
266 kr.

POP MART Labubu The Monsters Big Into Energy Series Figures Vinyl Plush Pendant Blind Box
439 kr.

OBOSOE Fleksibel klapvognsventilator – Bærbar ventilator med batteri, genopladelig med 3 hastigheder, til klapvogn, seng eller kontor Sort
86 kr.
Tidligere laveste pris:
116 kr.

POP MART Labubu The Monsters Exciting Macaron Vinyl Face Blind Box
999 kr.

G4 Halogenpærer / Stiftpærer - Halogen 10W (10-Pack)
69 kr.

Montessori Busy Board til børn 1-4 år, 12-sidet aktivitetslegetøj med Reißverschluss
140 kr.

FENCHILIIN Stor Hollywood Makeup Spejl med lys USB bordplade vægbeslag hvid 80 x 58 cm
961 kr.

FENCHILIIN hollywood spejl makeup spejl med lys dæmpbar med tre lystilstande bordplade vægbeslag make up spejl med belysning hvid 58 x 46cm
621 kr.
Anbefalede produkter

2-Pak - Lader til iPhone - Hurtiglader - Adapter + Kabel 20W USB-C
139 kr.

Timer til Klasselokalet - 60 minutter
149 kr.

Vibrationsplatform med Rope Skipping, Workout for hele kroppen Vibrations Fitness Platform Massagemaskine til hjemmetræning og formning Sort
599 kr.

INF TYPE-C Dual SD/TF-kortlæser til hurtig dataoverførsel 0
69 kr.

FENCHILIIN Hollywood makeup spejl med lys forstørrelse 360° drejelig bordplade hvid spejl 30 x 41 cm
395 kr.

3-Pak - Fidget Spinners med Sugekop til Børn
119 kr.

20-pak G4 halogenlamper 20W 12V - Varm hvid
99 kr.

Tabel ben tabelramme trapezformet designe industrielt design bordfod 60 x 72 cm stål
577 kr.

OBOSOE bærbar håndblæser/blæser med turbokraft – 5-trins, 3-i-1-funktion, perfekt til rejser og udendørsaktiviteter, kan hænges på nakken
114 kr.

FENCHILIIN Hollywood stort makeup spejl med lamper bordplade vægmonteret hvid spejl med lys
511 kr.